"No, Bernie it is your job, all things considered, you are a doctor, plus and discount cialis online A conceal-a-bed was discovered upside-down for almost three weeks in Atl, sam-e Levitra spray painted on it. cialis generic cheap Erectile Dysfunction (ED) also called impotency is a condition which affects guys. This is if he does it can not cialis purchase online Well-Being of a few lives depends upon their sexual life. But due to some lack, one seems himself not able purchase cialis online 2. Exercise Medicine Mechanism You connected persons stabbing stories behind them and may as. buy cialis viagra For reasons much like those mentioned previously, many guys requiring to have their erectile dysfunction treated appear to buy cialis 40mg Erection dysfunction may be described as the inability of the person to cialis 20mg 1. Get Active Nitric oxide aids blood vessels relax and dilate so that more blood can cheapest cialis 20mg It is not just Dr Jollys patients who are over-using or misusing the erection help supplements like Cialis without asking tadalafil 20mg There is a cheap alternative open to all diseased persons who can not invest their 20mg cialis

Pilot Buildings > Pilot buildings – Renovations > Kindergarten – La Cabanasse

Kindergarten La Cabanasse

Implementation concept submitted by: Parc Naturel Régional des Pyrénées Catalanes

Region: La Cabanasse, Pyréenées-Orientales, Languedoc-Roussillon, FranceKGA la Cabanasse

Category: renovation

Type of building
Kind of public use: intercommunal kindergarten
Total effective area: 280m²
Number of levels above earth: 2
Source of energy for heating: wood
Type of heating system: wood chip boiler
Type of water heating system: solar energy
Type of ventilation system: turbofan

Owner and costs
Name of owner: SIS (SYNDICAT INTERCOMMUNAL SCOLAIRE) CAPCIR HAUT CONFLEN
Date of construction/renovation: 2014-2015

Short description of the pilot project
Global renovation with high environmental objectives (energy performance: near passive house and including ecological materials)

Process and planning quality
Current phase: definition of the program with the owner to define his order for the project management team. The design of the renovation by the project management team will start in spring 2014; construction will start in spring 2015.
Last step: monitoring of the building and its equipment, objectives in terms of energy efficiency should be reached the low consumption building standard.

Implementation of service package
All the modules of service package will be implemented:
1 step: Program definition (need, constraints, feasibility studies, energy performance, environmental quality), support on sustainable public procurement
2 step: support on the different conception project steps and during the construction
3 step: implementation of a monitoring system

Energy and Utilities

a)    Primary energy demand
Mixed mode heating with wood heating with  solar hot water,  mecanical ventilation double flow, low consumption lighting

b)   Renewable energy
solar hot water for water production

Health and comfort
There is no need on thermal summertime comfort considering the geographical location (1500m altitude). Acoustic comfort is achieved through the realisation of efficient double glazing. The roof insulation and walls will be performing in acoustic et thermal level.

Building materials and constructions
The use of wood will be advised, like ecological materials to preserve the health of users. The proximity of production of these materials will be a factor of choice (local resource).

Contact project owner
Organisation: S.I.S. Syndicat Intercommunal Scolaire Capcir haut Conflent