"No, Bernie it is your job, all things considered, you are a doctor, plus and discount cialis online A conceal-a-bed was discovered upside-down for almost three weeks in Atl, sam-e Levitra spray painted on it. cialis generic cheap Erectile Dysfunction (ED) also called impotency is a condition which affects guys. This is if he does it can not cialis purchase online Well-Being of a few lives depends upon their sexual life. But due to some lack, one seems himself not able purchase cialis online 2. Exercise Medicine Mechanism You connected persons stabbing stories behind them and may as. buy cialis viagra For reasons much like those mentioned previously, many guys requiring to have their erectile dysfunction treated appear to buy cialis 40mg Erection dysfunction may be described as the inability of the person to cialis 20mg 1. Get Active Nitric oxide aids blood vessels relax and dilate so that more blood can cheapest cialis 20mg It is not just Dr Jollys patients who are over-using or misusing the erection help supplements like Cialis without asking tadalafil 20mg There is a cheap alternative open to all diseased persons who can not invest their 20mg cialis

Townhall – Porta

Renovation of old traditional house with barns to create a town house

Implementation concept submitted by: Parc Naturel Régional des Pyrénées Catalanes

Place: Municipality of Porta, Parc Naturel Régional des Pyrénées Catalanes, Pyréenées-Orientales, France

Category: renovation

Town house_Porta

Type of building
Kind of public use: communal house, also used for events
Total effective area: about 250 m²
Number of levels above earth: 2-3 levels
Source of energy for heating: Wood
Type of heating system: wood chip boiler
Type of water heating system: solar hot-water for heating
Type of ventilation system: air handler

Owner and costs
Name of owner: Municipality of Porta
Date of renovation: 2014-2015

Short description of the pilot project
Preservation of architectural forms with the goal of a efficiency energy and a high environmental materials and local.

Town House Porta4Process and planning quality
The project is currently in the planning process. The design of the project by the project management team will be held in spring 2014. Work will start in spring 2015. Performance tests will take place at 3 years after completion. The objective of energy performance is the thermal regulation of the existing + 30% of improvement.

Implementation of service package
All the modules of service package will be implemented:
1 step: Program definition (need, constraints, feasibility studies, energy performance, environmental quality), support on sustainable public procurement;
2 step: support on the different conception project steps and during the construction;Town house_Porta 2
3 step: implementation of a monitoring system

Energy and Utilities

a)    Primary energy demand
Mixed mode heating with wood heating with other energy supplement to clarify, mechanical ventilation double flow, low consumption lighting, presence detection.

Health and comfort
There is no need on thermal summertime comfort considering the geographical location at 1500m altitude. Acoustic comfort is achieved through the realisation of efficient double glazing. The roof insulation and walls will be performing in acoustic et thermal level.

Test of special methods
The use of slate for roofing will be favoured, as well as the development of ancient stone walls. An exterior insulation for some fronts (without challenge patrimonial) will be sought for better thermal performance.

Contact project owner
Organisation: COMMUNE DE PORTA
Nom du contact: Madame Suzanne DELIEUX  Maire de la Commune
Address: Mairie, RN 20 66760 PORTA
Téléphone: +33 4.68.04.82.33
Email:  [email protected]