"No, Bernie it is your job, all things considered, you are a doctor, plus and discount cialis online A conceal-a-bed was discovered upside-down for almost three weeks in Atl, sam-e Levitra spray painted on it. cialis generic cheap Erectile Dysfunction (ED) also called impotency is a condition which affects guys. This is if he does it can not cialis purchase online Well-Being of a few lives depends upon their sexual life. But due to some lack, one seems himself not able purchase cialis online 2. Exercise Medicine Mechanism You connected persons stabbing stories behind them and may as. buy cialis viagra For reasons much like those mentioned previously, many guys requiring to have their erectile dysfunction treated appear to buy cialis 40mg Erection dysfunction may be described as the inability of the person to cialis 20mg 1. Get Active Nitric oxide aids blood vessels relax and dilate so that more blood can cheapest cialis 20mg It is not just Dr Jollys patients who are over-using or misusing the erection help supplements like Cialis without asking tadalafil 20mg There is a cheap alternative open to all diseased persons who can not invest their 20mg cialis

Pilot Buildings > Pilot buildings – Renovations > Canteen – La Cabanasse

Canteen for children and old people – La Cabanasse

Implementation concept submitted by: Parc Naturel Régional des Pyrénées Catalanes

Region: La Cabanasse, Pyréenées-Orientales, Languedoc-Roussillion, France

Category: renovation

Type of buildingCanteen_La cabanasse
Kind of public use: Canteen hot line ground floor
Total effective area: 710 m²
Number of levels above earth: 2
Source of energy for heating: wood
Type of heating system: wood chip boiler
Type of water heating system: solar energy
Type of ventilation system: turbofan

Owner and Costs
Name of owner: Community of towns of Capcir Haut Conflent
Date of construction/renovation: 2014
Total cost: 1 250 000 € H.T.

Short description of the pilot project
Renovation of the existing canteen with ecological materials for the insulation, equipment inside.

Process and planning quality
Current phase: definition of the program with the owner to define his order for the project management team.  The design of the renovation by the project management team will start in winter 2013/2014. Construction will start in spring 2014. Last step: monitoring of the building and its equipment
Objectives in terms of energy efficiency should be reached: low Consumption Building (BBC renovation=64 kWh/m²/an) and variation according to the altitudeCanteen_La cabanasse2

Implementation of service package
All the modules of service package will be implemented: 1 step: Program definition (need, constraints, feasibility studies, energy performance, environmental quality), support on sustainable public procurement; step 2: support on the different conception project steps and during the construction; step 3: implementation of a monitoring system

Energy and Utilities

c)    Primary energy demand
wood boiler and hot solar water, mechanical ventilation double flow, low consumption lighting, presence detection

d)    Renewable energyCanteen_La cabanasse3
Wood boiler, hot solar water

Health and Comfort
There is no need on thermal summertime comfort considering the geographical location (1500m altitude). Acoustic comfort is achieved through the realisation of efficient double glazing. The roof insulation and walls will be performing in acoustic et thermal level.

Building materials and constructions
The use of wood will be advised, like ecological materials to preserve the health of users. The proximity of production of these materials will be a factor of choice (local resource).

Special methods
Exterior Insulation

Deviation
The project is located near a site classified as historical monuments, there Vauban Citadel of Mont-Louis, heritage by Unesco

Contact project owner
Communauté de communes du Capcir Haut Conflent (it’s a group of 17 muncipalities)
Contact: Col de la Quillane –  66210 LA LLAGONNE
Website: http://www.capcir-pyrenees.com/